SriGanganagar कागजों में बनी सीसी रोड और खंड़वंजा, हजम कर गए लाखों रुपए का बजट
2022-04-28
19
CC Road and Khandwanja made in paper, the budget of lakhs of rupees digested
Please enable JavaScript to view the
comments powered by Disqus.
Videos similaires
bird fair organised by patrika at water bodies of jodhpur
Earn Twenty Lakhs Annually From Water Chestnut Cultivation.
CC Road not repaired even after a month
Roads washed away in rain water in PM Modi constituency
Thousands of liters of water kept flowing in the road due to bursting
Water flowing at high speed on the road caused trouble, it will be completely fixed by evening
Issues of drinking water, electricity and roads dominated
The population of the village with the help of two handpumps, neither paved road nor tap-water scheme
For the first time, the department will make such arrangements that water will not accumulate on the road, incomplete four lane becomes a problem.
Video story- Feet full of water filling 100 meters long road on Anuppu