Headlines ARYNews 1100 31st July 2019

2019-07-31 106

KARACHI: Owing to monsoon rains, the Lath Dam near Super Highway has overflown and the floodwater has entered K-Electric’s KDA Grid station, located at Gulzar-e-Hijri Scheme 33, causing a massive breakdown in the megapolis