The panhard bar and brackets were made and tacked in place and checked for clearance. Two 3/4 inch grade 5 bolts were turned down to 1/2 inch on the ends to put the shocks on to the lower ladder bar bolts. Brackets for the outside on the shocks to connect to the ladder bar flanges is next on the list of things to make.