my Ural driver understand again just crap. is to load the stone from the wheel loader onto the low loader grrrrrrrrrrrrrrrr no no no, this is a big idiot !!!.
Two Blocks, one have 30 tons going to the new Construction site.
this is not a good first day in carrara world :0(
The new RC World is open:0)) The first Machine a stone cutter got to Carrara World :0)) All other machines follow in the new RC World.
The new M.A.N. 8x8 is for the 40-50 ton Stones and the Tipper is a 6x6 Wheel Drive King Hauler :0)) .