http://www.hascallandhall.com/
Hascall & Hall was working with a general contractor on the renovation of a building in Bangor to become a new location for Cross Insurance.
We were called in for what was believed to be a simple application of a self-leveling floor system that would be a proper substrate for the installation of wall-to-wall carpeting. There had been some drilling in the floor for purposes such as water and power lines.
In most every circumstance involving something unexpected on a jobsite, the result is an increase in the cost of the project and changes to the timeline. It is important that we act quickly in these circumstances to mitigate the consequences all around. Hascall & Hall’s goal is to always keep the flow of work moving towards a job that is completed safely with excellent craftsmanship and within budget.