Replacement of 450 mm diameter Rising Main Sewer line at Jaibharat Pumping station(5th October 2013).
The Jaibharat Society and other surrounding areas of 3rd Road Khar were suffering
since many years due to the old and dilapidated Rising Main Sewer Line from
Jaibharat Pumping station upto Khar Station which was repeatedly bursting as a result
of which large quantum of Sewage water was being discharged into the storm water
drain railway culverts thereby increasing flooding in the area during
monsoon.With the constant follow ups and Joint Meetings with the BMC
Administration the replacement work of the rising main is being carried out
through the initiatives and efforts of Priya Dutt MP and Baba Siddique
MLA, the Local residents of Jaibharat Society and Local Councillor ward No.95.
Baba Siddique seen inaugurating the proposed work on Saturday 5th October 2013
alongwith Local residents.
Further improvement planned is construction of Tunnel under the Railway tracks
under the MSDP Department connecting Jaibharat Pumping at Kharwadi outfell.
Constant followups with the BMC Administration and Railway authorities is being
carried out and necessary charges to the Railways for the implementation of the
same has been paid.
Website- www.babasiddique.com
Twitter-https://twitter.com/babasiddique
Youtube- http://www.youtube.com/babasiddique